Lakeland Bathroom Remodel Timeline & Permits

Lakeland Bathroom Remodel Timeline & Permits

Planning a bathroom remodel in Lakeland works best when the details are handled before demo. Know what you want to change, get the right permits, order materials early, and set a clear weekly plan. Below is how we guide homeowners in Polk County from first idea to final inspection.

Start with scope and goals

Write a short list of must haves and nice to haves. If the layout works, keeping plumbing in place saves time. Grab a tape and a notepad. Measure walls, ceiling height, and door swings. Note where drains and water lines enter. Take a few photos for reference.

Think about ventilation and moisture

A strong, quiet fan that vents outside is worth it. Proper waterproofing around the shower is the difference between “looks good now” and “still looks good in five years.”

Order the slow stuff first

Lead times can slow a job. Order tile, trims, valves, vanity, top, sink, fan, lights, and custom glass early. Store them safely so everything is on site when demo starts.

Permits and inspections in Polk County

If you touch plumbing, electrical, structure, or move fixtures, expect to pull permits. Cosmetic swaps often do not, but it is smart to check with Polk County or the City of Lakeland before you begin. We help file the paperwork and schedule inspections so work keeps moving.

Typical inspection path

  • Rough in after framing, before drywall for plumbing and electrical
  • Waterproofing check for showers when required
  • Final inspection once fixtures, venting, and protection devices are in place

Older homes in Lakeland

You might uncover cast iron drains, block walls, or tired wiring. Set a small contingency. When surprises pop up, we stop, document with photos, explain options, and get your written approval before we proceed.

A simple week by week timeline

Every project is different, but this flow fits many hall and primary baths.

Week 1: Demo and prep

Protect floors, set dust control, remove finishes, open walls and floors, inspect framing, mark new locations, and stage for the trades.

Week 2: Rough work and first inspection

Run new supply and drain lines, add blocking for grab bars and accessories, update circuits and GFCI or AFCI protection. Call for rough inspections.

Week 3: Waterproofing and tile

Install backer board, membranes, and shower pan. Flood test if needed. Set tile and grout. Let everything cure. Do it right and you will not think about leaks again.

Week 4: Set fixtures and wrap up

Set the vanity and top, mount the toilet, install shower trim, hang lights and fan, paint, caulk, and clean. Schedule final inspection. If you chose custom glass, it is measured earlier and installed now. Final walk through and punch list close the job.

Ready to plan your Lakeland bathroom? Request a free onsite consultation and we will handle design, permits, and build.

What affects cost and schedule

We will not list prices here. Instead, watch the levers that move budgets and time.

  • Layout changes versus like for like
  • Tile complexity, patterns, and edge details
  • Waterproofing system and any subfloor repairs
  • Fixture quality and special finishes
  • Hidden issues found during demo

FAQs: bathroom remodeling in Lakeland

Do I need a permit?
Yes if you move fixtures, update plumbing or electrical, or change structure. Cosmetic updates often do not. We confirm with the local office before work begins.

How long does it take?
About four weeks once work starts, if inspections and materials line up. Custom tile or glass can add time.

Can I use the bathroom during the project?
Usually that bath is offline. For single bathroom homes, we plan phases to reduce downtime and set clear dates.

What inspections should I expect?
Rough in, sometimes a waterproofing check, then final. The permit notes the sequence.

How do you handle mold or damage found during demo?
We pause, document, and present a plan. Work resumes after you approve the change.

What about warranties?
Products carry manufacturer warranties. Our workmanship warranty covers installation. Terms are in your contract.

When should I order materials?
During design. Confirm stock and place orders before demo so the schedule stays tight.

Why choose Evangelisto Construction

  • Licensed, insured, and local to Polk County
  • Clean jobsites, clear schedules, and daily updates
  • Permits and inspections handled in house

Core services

  1. Bathroom remodeling
  2. Kitchen remodeling
  3. Whole home renovations

Contact us today to plan your remodel the right way! Visit our Bathroom Remodeling Services, browse Our Portfolio, or Contact Us to get started.